Smoke & Heat Extraction Ventilation
Design of smoke control systems for safe evacuation during a fire.
← All Services
We design smoke and heat extraction ventilation systems that maintain visibility and safe evacuation routes during a fire — technical solution and documentation under EN 12101.
Applicable Standard: EN 12101
When you need this
Required in buildings with large volumes, atriums, underground parking or long evacuation corridors, where natural ventilation isn't enough.
What's included
- Calculating the required smoke and heat extraction rate
- Selecting fans, dampers and the control system
- Ductwork layout and discharge points
- Technical documentation under EN 12101
What information we need
- Architectural plan and sections
- Intended use of the spaces
- Structural details — ceilings, atriums
How the process works
- 1You send us the architectural plan and sections of the building
- 2We determine the fire scenarios used for sizing
- 3We prepare the calculations and design
- 4We hand over documentation ready for installation